Concrete conservation action C2 is starting

It is currently in progress the concrete conservation action aimed at the preservation of the integrity of the Posidonia beds in areas degraded, for example by the action of plowing by anchors and / or fishing gear, areas identified in the preparatory action. The activity consists in positioning, on the seabed, the geomats on which…

Concrete action C 1 underway

The positioning work of the 20 buoys for mooring boats up to 24 meters in length is currently underway. The activity is planned as part of the concrete action of preservation C 1 aimed at the protection of priority habitat 1120 * Prairie of Posidonia (Posidonion oceanicae). At the time the buoys are intended for operators…